Grant walker engineering
menu

Our Projects

Stoke Mandeville

NHS

Over a rolling contract at Stoke Mandeville hospital, we have provided supplies to the new Xray and MRI installations, which incorporated new supplies running over an existing roof and the installation of a roof mounted LV panel. This enabled the hospital to have the much need additional resilience within the current LV system.

We have also provide the small power and lighting to the a new VIE installation, the compound was built during the later stages of Covid. This enabled the hospital to run at an ever increasing capacity as the need for more oxygen increased. We have also provided much need upgrade to the hospital car park LED and the integration of the first EV chargers which will help power their new fleet of electric cars.

Stoke Mandeville

Lets start a project together

Get in touch >

Grant walker engineering

> London Office

The Boiler Room

Zetland House

5-25 Scrutton Street

London, EC2A 4HJ

T: 0203 818 1150

> Hampshire Office

1st Floor

6 Faraday Office Park

Rankine Road

Basingstoke

Basingstoke, Hants, RG24 8QB

T: 01256 280332

keeley.leonard@g-w-e.com

© Grant Walker Engineering 2023