Grant walker engineering
menu

Our Projects

Project Trent

Overbury GSK Lab upgrade project

This project is wide and varied, creating new laboratories and office spaces, from the initial site and cabin temps to the final handover to GSK facilities.

The installation includes the rip out and adaptation of the existing installation within Building 7 and sections of building 8 basement, ground, and void areas, with a complete new fit-out on floors 1 and 2. The type of work undertaken will be the alteration of existing LV panels, the installation of horizontal Busbar systems and associated high-level feeder busbars to all the laboratory small power, new dimming and lighting systems throughout, and the upgrade of the fire alarm, data, access control, and small power. All resulting in a highly quality BREEAM excellent rated development.

Project Trent

Lets start a project together

Get in touch >

Grant walker engineering

> London Office

The Boiler Room

Zetland House

5-25 Scrutton Street

London, EC2A 4HJ

T: 0203 818 1150

> Hampshire Office

1st Floor

6 Faraday Office Park

Rankine Road

Basingstoke

Basingstoke, Hants, RG24 8QB

T: 01256 280332

keeley.leonard@g-w-e.com

© Grant Walker Engineering 2023