CALL US ON  (+44) 1256 345 590

Project Memphis – ISG Interiors £1,875,000.00

GWE, continuing their key relationship with ISG Interiors, have been awarded the circa £1.8m Electrical Installation in the prestigious location in Canary Wharf. GWE were commissioned at tender stage initially where we provided a high-level budget for the works. Once ISG were appointed GWE, in line with the completion of the design, were awarded the Electrical Contract for the works. Our package includes the supply and installation of all aspects of the Electrical package from containment to lighting installation

and all modular and light control systems in between.

Expected completion for this project is the end of 2017.

  • The end product was simply outstanding…

    It wasn’t just the insights that impressed me, they had the technical knowledge but described everything in simplistic terms. The end product was simply outstanding.
    Account Director, London 
  • …to say I’m impressed is an understatement.

    Our requirements were anything but simple. GWE excelled in both the approach and the implementation, they had ideas that we didn’t think of and they stuck to all of our requirements, to say I’m impressed is an understatement.

    CEO Fintech Company, London

  • Grant Walker Engineering provided an excellent service

    I was very happy with the work completed by the Grant walker team. From the whole lifecycle of the project, they provided an excellent service in a challenging environment and ensured that the work was finished to a high standard.

    Account Manager at Communications agency

     

Enjoy a coffee with us

LONDON

Holland House, 4 Bury Street, Gherkin Piazza

London, EC3A 5AW

Hampshire

Worting House, Suite 21, Basingstoke

Hampshire, RG23 8PY

Need more information?

LEAVE FEEDBACK