The London School of Economics is a 15,500 sq M 13 story & 6 story interlinked development being undertaken by MACE. GWE have been appointed in conjunction with Dornan Engineering to complete the Electrical installation of the project. Our scope includes the following: High and low-level containment systems for Electrical, Data, AV and Fire & Security, high and low-level wiring system feeding lighting and small power, low level busbar and floor box system, power distribution system, consisting of over 40 distribution boards with in the two buildings and an advanced Dali two lighting control system. The programme constraints of this project are very demanding with all works on site being complete with in 45 weeks.